BtMData — Energía y compliance para centros de datos
    Linz

    IT- und Data Center Urfahr

    Verified profile of IT- und Data Center Urfahr (LINZ STROM GAS WÄRME GmbH), a data centre in Linz, Austria: mapped location, grid context and nearby…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Linz, Austria
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    LINZ STROM GAS WÄRME GmbH

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~5.5 ms RTT → Frankfurt (454 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerLINZ STROM GAS WÄRME GmbH
    Published capacity—
    CityLinz
    CountryAustria
    AddressFreistädter Straße 204, 4040
    Coordinates48.32421, 14.30001
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for IT- und Data Center Urfahr

    Assess an asset with GridPass