Google Data Center
Verified profile of Google Data Center (Google), a data centre in Quaregnon, Belgium: mapped location, grid context and nearby renewables.
MW
—
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
Not published
Operator
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~3.1 ms RTT → Paris (210 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | |
|---|---|
| Published capacity | — |
| City | Quaregnon |
| Country | Belgium |
| Address | — |
| Coordinates | 50.46767, 3.86446 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Building capacity and opening year unverified. Google dates the St. Ghislain campus to 2010 without identifying this building: https://datacenters.google/locations/belgium/ (publication date unavailable; reviewed 2026-10-16). Campus year 2010 removed from building field; possible overlap with GBL1. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.