    Quaregnon

    Google Data Center

    Verified profile of Google Data Center (Google), a data centre in Quaregnon, Belgium: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Quaregnon, Belgium
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Google

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.1 ms RTT → Paris (210 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGoogle
    Published capacity—
    CityQuaregnon
    CountryBelgium
    Address—
    Coordinates50.46767, 3.86446
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity noteBuilding capacity and opening year unverified. Google dates the St. Ghislain campus to 2010 without identifying this building: https://datacenters.google/locations/belgium/ (publication date unavailable; reviewed 2026-10-16). Campus year 2010 removed from building field; possible overlap with GBL1.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed16/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.