BtMData — Energía y compliance para centros de datos
    Černý Most

    Datové centrum Kokura

    Verified profile of Datové centrum Kokura, a data centre in Černý Most, Czechia since 2015: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Černý Most, Czechia
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2015

    Operator

    Not published

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~5.2 ms RTT → Frankfurt (421 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developer—
    Published capacity—
    CityČerný Most
    CountryCzechia
    Address—
    Coordinates50.11726, 14.59290
    Year2015
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Datové centrum Kokura

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass