atNorth DEN01
Verified profile of atNorth DEN01 (atNorth), a 30 MW data centre in Copenhague (Ballerup), Denmark since 2025: mapped location, grid context and nearby…
MW
30
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
30 MW
Year
2025
Operator
atNorth
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~7.1 ms RTT → Amsterdam (613 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | atNorth |
|---|---|
| Published capacity | 30 MW |
| City | Copenhague (Ballerup) |
| Country | Denmark |
| Address | — |
| Coordinates | 55.73000, 12.36000 |
| Year | 2025 |
| Status | Operational |
| Phase | 30 MW campus, atNorth's first in Denmark |
| Expected year | 2026 |
| IT load | — |
| Capacity note | 30 MW campus capacity; first phase live Q4 2025 (atNorth official site, accessed 16-10-2026). |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.