atNorth FIN02
Verified profile of atNorth FIN02 (atNorth), a 45 MW data centre in Helsinki (Espoo), Finland since 2025: mapped location, grid context and nearby renewables.
MW
45
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
45 MW
Year
2025
Operator
atNorth
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~15.9 ms RTT → Amsterdam (1490 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | atNorth |
|---|---|
| Published capacity | 45 MW |
| City | Helsinki (Espoo) |
| Country | Finland |
| Address | — |
| Coordinates | 60.21000, 24.66000 |
| Year | 2025 |
| Status | Operational |
| Phase | atNorth's second Finnish facility |
| Expected year | — |
| IT load | — |
| Capacity note | 45 MW of contracted electrical supply access from Caruna, NOT IT capacity or measured operating load. The same release explicitly states operational since April 2025. Source: https://www.atnorth.com/news/atnorth-announces-heat-reuse-partnership-with-kesko-corporation/ (published April 2025; reviewed 2026-10-16). Previous 40 MW removed without readable evidence; current IT capacity unverified. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.
