Fluidstack 1GW AI campus France
Verified profile of Fluidstack 1GW AI campus France (Fluidstack), a 1000 MW data centre in Francia (por confirmar), France: mapped location, grid context…
MW
1000
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
1000 MW
Year
Not published
Operator
Fluidstack
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~3.5 ms RTT → Paris (251 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Fluidstack |
|---|---|
| Published capacity | 1000 MW |
| City | Francia (por confirmar) |
| Country | France |
| Address | — |
| Coordinates | 46.60000, 2.40000 |
| Year | — |
| Status | Announced |
| Phase | 1 GW AI supercomputer announced at the 2025 Paris summit |
| Expected year | — |
| IT load | — |
| Capacity note | 1 GW announced: Fluidstack press release (MoU with French government), 2025-02-10. Site and year unconfirmed. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 15/10/2026 |