Global Switch Paris
Verified profile of Global Switch Paris (Global Switch), a 81 MW data centre in Clichy, France: mapped location, grid context and nearby renewables.
MW
81
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
81 MW
Year
Not published
Operator
Global Switch
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Paris (6 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Global Switch |
|---|---|
| Published capacity | 81 MW |
| City | Clichy |
| Country | France |
| Address | 7-9 rue Petit, 92582 |
| Coordinates | 48.90348, 2.30512 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Campus: Paris East 22 + West 17 + North 24 + South 18 MW, per Global Switch website (IT vs supply not stated). Checked 19 Oct 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.