    Data centres in Germany

    Map and list of the 675 data centres in Germany: operator, capacity in MW, year and a linked source on every page.

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Assess my asset

    Sites

    675

    Cities

    0

    Substations ≥220 kV

    0

    Renewables ≥20 MW

    0

    Power and grid

    Clean electricity

    59.1%

    Renewables

    59.1%

    Carbon intensity

    329.65 gCO₂/kWh

    Annual demand

    520.01 TWh

    Sources: Ember – Yearly Electricity Data (2025)

    Grid congestion and connection pipeline in Germany

    Grid availability decides where data centres get built: lower congestion and shorter queues attract more capacity.

    Grid congestion

    4.6%

    European average 1.5%

    Years in connection queue

    6.5

    European average ~4 years

    Growth 2024-2030

    1.6x

    European average 1.8x

    Frankfurt grid operators have effectively halted new data centre connections until at least 2030.

    Congestion measured as redispatch and countertrading volumes as a share of demand (2021-2023).

    Data centres in Germany

    The BtMData map records 665 data centres in Germany (658 operational, 6 under construction, 1 announced). 8 have published capacity, totalling 334 MW; the rest are pending a verifiable source. Main operators: Digital Realty, Hetzner, Equinix, NTT DATA, Inc., Vantage Data Centers.

    Sites

    NameOperatorCityMWYearSource

    Data verified by BtMData. Unpublished values appear as “—”.

    Frequently asked questions

    How many data centres are there in Germany?

    Our map lists 675 data centres in Germany across 0 cities. Profiles include recorded data and sources; pending fields do not constitute verified information.

    How much renewable capacity is registered in Germany?

    We track 0 geolocated renewable plants in Germany, plus 0 substations of 220 kV or above.