    Segrate

    Cyrusone MIL1

    Verified profile of Cyrusone MIL1 (CyrusOne Data Centers), a 27 MW data centre in Segrate, Italy: mapped location, grid context and nearby renewables.

    MW

    27

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Segrate, Italy
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    27 MW

    Year

    Not published

    Operator

    CyrusOne Data Centers

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.1 ms RTT → Milan (6 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerCyrusOne Data Centers
    Published capacity27 MW
    CitySegrate
    CountryItaly
    AddressVia Reggio Emilia, 39, 20054
    Coordinates45.48437, 9.26819
    Year—
    StatusUnder construction
    PhaseUnder construction. First phase scheduled Q3 2027; not operational.
    Expected year2027
    IT load27 MW
    Capacity note27 MW IT design capacity for the initial building: official release 2025-04-02 https://www.cyrusone.com/resources/press-releases/cyrusone-to-expand-presence-in-italy-with-second-data-center-in-milan . Current site page publishes 63 MW for the wider site, not assigned to this building: https://www.cyrusone.com/data-centers/emea/milan-italy (undated). Construction start confirmed by DCD 2026-03-26: https://www.datacenterdynamics.com/en/news/cyrusone-breaks-ground-on-first-italian-data-center-outside-milan/ . First phase scheduled Q3 2027, not actual commissioning; operational status corrected to under construction. Reviewed 2026-10-16.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed16/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.