Cyrusone MIL2
Verified profile of Cyrusone MIL2 (CyrusOne Data Centers), a 54 MW data centre in Segrate, Italy: mapped location, grid context and nearby renewables.
MW
54
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
54 MW
Year
Not published
Operator
CyrusOne Data Centers
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Milan (6 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | CyrusOne Data Centers |
|---|---|
| Published capacity | 54 MW |
| City | Segrate |
| Country | Italy |
| Address | Via Raffaele Rubattino, 90, 20134 |
| Coordinates | 45.48052, 9.26469 |
| Year | — |
| Status | Announced |
| Phase | Announced project, 54 MW IT design capacity. Commissioning unconfirmed. |
| Expected year | — |
| IT load | 54 MW |
| Capacity note | 54 MW IT planned for MIL2 in official announcement 2025-04-02: https://www.cyrusone.com/resources/press-releases/cyrusone-to-expand-presence-in-italy-with-second-data-center-in-milan . Operational status corrected to announced project; actual commissioning unverified. Expected utility supply from 2028 is not a data center opening date. Reviewed 2026-10-16. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |