Vantage MXP2 Milan II
Verified profile of Vantage MXP2 Milan II (Vantage Data Centers), a 32 MW data centre in Castelletto di Cuggiono, Italy: mapped location, grid context and…
MW
32
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
32 MW
Year
Not published
Operator
Vantage Data Centers
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.3 ms RTT → Milan (30 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Vantage Data Centers |
|---|---|
| Published capacity | 32 MW |
| City | Castelletto di Cuggiono |
| Country | Italy |
| Address | Via Aganippo Brocchi, 20019 |
| Coordinates | 45.53700, 8.82300 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | 32 MW |
| Capacity note | Campus total (2 buildings): 32 MW critical IT load per Vantage; first phase scheduled spring 2026. Checked 19 Oct 2026. Pin moved to Castelletto di Cuggiono (approximate, municipality level) on 21 Oct 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 21/10/2026 |