Eurofiber Data Center Amsterdam
Verified profile of Eurofiber Data Center Amsterdam (Eurofiber), a data centre in Hoofddorp, Netherlands since 2020: mapped location, grid context andβ¦
MW
β
Substations <25 km
β
Renewables <25 km
β
Renewable MW nearby
β
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
2020
Operator
Eurofiber
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.2 ms RTT β Amsterdam (17 km)
Computed: geodesic distance / 200 kmΒ·msβ»ΒΉ
Current ambient temperature
β¦
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loadingβ¦
Data centre record
| Operator / developer | Eurofiber |
|---|---|
| Published capacity | β |
| City | Hoofddorp |
| Country | Netherlands |
| Address | Parellaan 9, 2132WS |
| Coordinates | 52.29038, 4.68707 |
| Year | 2020 |
| Status | Operational |
| Phase | β |
| Expected year | β |
| IT load | β |
| Capacity note | β |
| PUE | β |
| Energy type | β |
| Renewable energy | β |
| Energy note | β |
| Certifications | β |
| Certification note | β |
| Record last reviewed | 14/09/2026 |
We only publish verifiable data. Anything the operator does not publish shows as βββ; it is never estimated.
