Switch Datacenters AMS4
Verified profile of Switch Datacenters AMS4 (Switch Datacenters), a 14 MW data centre in Diemen, Netherlands since 2024: mapped location, grid context and…
MW
14
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
14 MW
Year
2024
Operator
Switch Datacenters
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Amsterdam (6 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Switch Datacenters |
|---|---|
| Published capacity | 14 MW |
| City | Diemen |
| Country | Netherlands |
| Address | Treubweg 11, 1112 BA |
| Coordinates | 52.33151, 4.97360 |
| Year | 2024 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | 14 MW |
| Capacity note | 14 MW IT design load; opened 2024 (Switch Datacenters official site). Checked 19 Oct 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 14/09/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.