    Vennesla

    Bulk N01 Campus

    300-hectare campus in Agder next to one of Europe's largest transformer stations, with redundant connections to multiple hydropower stations. Existing capacity is contracted and a 42 MW facility has been added; the operator is working with grid companies to add 300 MW.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Vennesla, Norway
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Bulk Infrastructure

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~7.8 ms RTT → Amsterdam (682 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerBulk Infrastructure
    Published capacity—
    CityVennesla
    CountryNorway
    Address—
    Coordinates58.24400, 7.97700
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity noteTotal campus capacity and initial opening year unverified. Official 2024-01-23 release confirms a 12 MW facility ready in 2023 and a further 42 MW then under construction: https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand (reviewed 2026-10-16). Phases are not added and an expansion opening is not assigned to the whole campus.
    PUE—
    Energy typeHydroelectric
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed16/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.