BtMData — Energía y compliance para centros de datos
    Hamar

    Green Mountain Hamar expansion

    Verified profile of Green Mountain Hamar expansion (Green Mountain), a data centre in Hamar, Norway: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Hamar, Norway
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Green Mountain

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~11.2 ms RTT → Amsterdam (1019 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGreen Mountain
    Published capacity—
    CityHamar
    CountryNorway
    AddressArnsetvegen 49, 2324 Vang p\u00e5 Hedmarken
    Coordinates60.84264, 11.26661
    Year—
    StatusAnnounced
    PhaseExpansion of the OSL2 campus for a hyperscale client
    Expected year—
    IT load—
    Capacity notePlanned expansion (2 × 30 MW buildings). Not under construction per operator; power not added to avoid double counting.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteLocation: OSL-Hamar campus point. Green Mountain's official site and Hamar municipality place the 2 planned buildings within the same Heggvin campus (Arnsetvegen 49). Exact location of each planned building not published by the operator; the marker uses the campus centre.
    Certifications—
    Certification note—
    Record last reviewed22/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Green Mountain Hamar expansion

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass