Green Mountain OSL-Enebakk
75,000 m2 site 20 km outside Oslo with line-of-sight capacity of 93 MW. First 4 MW building completed in 2020, a 13.5 MW colocation building in 2022 and a third 10 MW building in 2024.
MW
93
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
93 MW
Year
2020
Operator
Green Mountain
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~10.1 ms RTT → Amsterdam (907 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Green Mountain |
|---|---|
| Published capacity | 93 MW |
| City | Enebakk |
| Country | Norway |
| Address | — |
| Coordinates | 59.75700, 11.13000 |
| Year | 2020 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | 93 MW de diseño; primer edificio terminado en octubre de 2020: web de Green Mountain, consultada 15-10-2026. |
| PUE | — |
| Energy type | Hydroelectric |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 15/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.