Green Mountain OSL-Hamar
Norway's largest data center campus. Three completed buildings (90 MW) contracted to a single tenant, with a line-of-sight site capacity of 150 MW. Powered by hydropower.
MW
90
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
90 MW
Year
2023
Operator
Green Mountain
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~11.2 ms RTT → Amsterdam (1019 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Green Mountain |
|---|---|
| Published capacity | 90 MW |
| City | Vang (Hamar) |
| Country | Norway |
| Address | Stabekkvegen 140, 2324 |
| Coordinates | 60.84264, 11.26661 |
| Year | 2023 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | 90 MW |
| Capacity note | 90 MW IT in service (3 × 30 MW buildings, 2023). Campus allows up to 150 MW with 2 more planned buildings, not included. |
| PUE | — |
| Energy type | Hydroelectric |
| Renewable energy | — |
| Energy note | Location: centre of the 3 OpenStreetMap buildings, consistent with the official 2324 postcode (Vang på Hedmarken). Approximate point. |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 22/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.