Green Mountain Undheim
Data center under construction in Undheim, Rogaland.
MW
80
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
80 MW
Year
Not published
Operator
Green Mountain
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~8.1 ms RTT → Amsterdam (707 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Green Mountain |
|---|---|
| Published capacity | 80 MW |
| City | Undheim |
| Country | Norway |
| Address | — |
| Coordinates | 58.70600, 5.86300 |
| Year | — |
| Status | Under construction |
| Phase | — |
| Expected year | 2028 |
| IT load | 80 MW |
| Capacity note | 80 MW IT planned in 2 buildings; 100 MW maximum total capacity. Completion scheduled for 2028. |
| PUE | — |
| Energy type | Hydroelectric |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 22/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.