    Undheim

    Green Mountain Undheim

    Data center under construction in Undheim, Rogaland.

    MW

    80

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Undheim, Norway
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    80 MW

    Year

    Not published

    Operator

    Green Mountain

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~8.1 ms RTT → Amsterdam (707 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGreen Mountain
    Published capacity80 MW
    CityUndheim
    CountryNorway
    Address—
    Coordinates58.70600, 5.86300
    Year—
    StatusUnder construction
    Phase—
    Expected year2028
    IT load80 MW
    Capacity note80 MW IT planned in 2 buildings; 100 MW maximum total capacity. Completion scheduled for 2028.
    PUE—
    Energy typeHydroelectric
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed22/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Green Mountain Undheim

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass