    Måløy

    Lefdal Mine Datacenter

    Underground data center in a former olivine mine, up to 700 m inside the mountain and 60 m below sea level, cooled with fjord water and powered by Norwegian hydropower.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Måløy, Norway
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2017

    Operator

    Lefdal Mine Datacenter

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~11.7 ms RTT → Amsterdam (1070 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerLefdal Mine Datacenter
    Published capacity—
    CityMåløy
    CountryNorway
    Address—
    Coordinates61.98400, 5.30200
    Year2017
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity noteOpening confirmed in May 2017: https://www.datacenterdynamics.com/en/news/lefdal-mine-datacenter-officially-opens/ (published 2017-05-12; reviewed 2026-10-16). Current capacity unverified. 10 MW installed is a historical 2020 value: https://www.datacenterdynamics.com/en/news/columbia-threadneedle-acquires-majority-stake-lefdal-mine-datacenter/ (published 2020-05-07; reviewed 2026-10-16), not current capacity or 200 MW potential.
    PUE—
    Energy typeHydroelectric
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed16/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Lefdal Mine Datacenter

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass