STACK EMEA OSL01 Ulven
Oslo data center of 5,100 sqm and 7.5 MW capacity in the Økern district, originally built in 1981 as a government data center and communications hub.
MW
7.5
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
7.5 MW
Year
Not published
Operator
STACK EMEA
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~10.2 ms RTT → Amsterdam (916 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | STACK EMEA |
|---|---|
| Published capacity | 7.5 MW |
| City | Oslo |
| Country | Norway |
| Address | Ulvenveien 89B, 0581 |
| Coordinates | 59.92800, 10.81100 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | 7.5 MW total capacity published in historical STACK datasheet: https://www.stackinfra.com/wp-content/uploads/2022/02/OSL01_Ulven_022322.pdf (2022 version; reviewed 2026-10-16). Current operating capacity unverified. Opening year 1981 removed: source says designed and built in 1981, not commissioned. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.