STACK EMEA OSL02 Rosenholm
Oslo-area colocation data center at Rosenholm, operated by STACK EMEA.
MW
4
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
4 MW
Year
Not published
Operator
STACK EMEA
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~10 ms RTT → Amsterdam (904 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | STACK EMEA |
|---|---|
| Published capacity | 4 MW |
| City | Trollåsen |
| Country | Norway |
| Address | Rosenholmveien 25, 1414 |
| Coordinates | 59.81000, 10.79700 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | 4 MW IT for OSL02A (Rosenholm), STACK datasheet: https://www.stackinfra.com/wp-content/uploads/2022/02/OSL02A_Fin-1.pdf (no printed publication date; reviewed 2026-10-16). Historical published capacity, not a current measurement. Opening year unverified; directory year 2010 not adopted. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |