STACK EMEA OSL03 Fetsund
Two-hectare campus in Fetsund with three operational modular data centers (OSL03A, B and C), powered by 100% renewable energy.
MW
14
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
14 MW
Year
Not published
Operator
STACK EMEA
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~10.3 ms RTT → Amsterdam (925 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | STACK EMEA |
|---|---|
| Published capacity | 14 MW |
| City | Fetsund |
| Country | Norway |
| Address | — |
| Coordinates | 59.93100, 11.16600 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | 14 MW total for OSL03A-C in November 2022 STACK datasheet; additional 6 MW OSL03D excluded, no 20 MW assigned as operational. Source: https://www.stackinfra.com/wp-content/uploads/2022/02/STACK-OSL03-Nov-22.pdf (November 2022 version; reviewed 2026-10-16). Current operating capacity and initial campus opening year unverified. |
| PUE | — |
| Energy type | Renewable |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.