Stargate Norway (Narvik)
Verified profile of Stargate Norway (Narvik) (Nscale / Aker ASA), a 230 MW data centre in Narvik, Norway: mapped location, grid context and nearby renewables.
MW
230
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
230 MW
Year
Not published
Operator
Nscale / Aker ASA
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~20.1 ms RTT → Amsterdam (1906 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Nscale / Aker ASA |
|---|---|
| Published capacity | 230 MW |
| City | Narvik |
| Country | Norway |
| Address | — |
| Coordinates | 68.44000, 17.43000 |
| Year | — |
| Status | Announced |
| Phase | 230 MW AI campus announced in 2025, expandable |
| Expected year | — |
| IT load | — |
| Capacity note | 230 MW initial phase: Nscale/Aker/OpenAI press release, 2025-07-31. Project. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 15/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.