BtMData β€” EnergΓ­a y compliance para centros de datos
    Varsovia

    Atman WAW-3

    Verified profile of Atman WAW-3 (Atman), a data centre in Varsovia, Poland: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Varsovia, Poland
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Atman

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~9.9 ms RTT β†’ Frankfurt (890 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerAtman
    Published capacityβ€”
    CityVarsovia
    CountryPoland
    Addressβ€”
    Coordinates52.23000, 21.01000
    Yearβ€”
    StatusUnder construction
    PhaseAtman's third Warsaw facility
    Expected year2026
    IT loadβ€”
    Capacity noteβ€”
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed11/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Atman WAW-3

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass