Data4 Warsaw campus
Verified profile of Data4 Warsaw campus (Data4), a 60 MW data centre in Jawczyce (Varsovia), Poland since 2023: mapped location, grid context and nearby…
MW
60
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
60 MW
Year
2023
Operator
Data4
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~9.8 ms RTT → Frankfurt (879 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Data4 |
|---|---|
| Published capacity | 60 MW |
| City | Jawczyce (Varsovia) |
| Country | Poland |
| Address | — |
| Coordinates | 52.22000, 20.85000 |
| Year | 2023 |
| Status | Operational |
| Phase | Campus of up to 60 MW IT outside Warsaw |
| Expected year | 2026 |
| IT load | — |
| Capacity note | First building commissioned 2023; second 10 MW building inaugurated (Data4 press release, 09-04-2026). Total campus power unverified. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.