BtMData — Energía y compliance para centros de datos
    Włochy

    Equinix WA3

    Verified profile of Equinix WA3 (Equinix), a data centre in Włochy, Poland: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Włochy, Poland
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Equinix

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~9.8 ms RTT → Frankfurt (883 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerEquinix
    Published capacity—
    CityWłochy
    CountryPoland
    Address—
    Coordinates52.19037, 20.92237
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity notePending: Equinix publishes floor area and redundancy, not power; directory figures are not used.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed19/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Equinix WA3

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass