Vantage Warsaw WAW1
Verified profile of Vantage Warsaw WAW1 (Vantage Data Centers), a 48 MW data centre in Warszawa, Poland since 2022: mapped location, grid context and nearby…
MW
48
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
48 MW
Year
2022
Operator
Vantage Data Centers
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~9.9 ms RTT → Frankfurt (885 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Vantage Data Centers |
|---|---|
| Published capacity | 48 MW |
| City | Warszawa |
| Country | Poland |
| Address | Zgrupowania AK „Kampinos” 42D, 01-943 |
| Coordinates | 52.29304, 20.92159 |
| Year | 2022 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | 48 MW IT design capacity; operational since 14-06-2022 (Vantage press release, 14-06-2022; Data Centre Review 17-06-2022). |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |