Start Campus Sines SIN02
Verified profile of Start Campus Sines SIN02 (Start Campus), a 200 MW data centre in Sines, Portugal: mapped location, grid context and nearby renewables.
MW
200
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
200 MW
Year
Not published
Operator
Start Campus
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~6.2 ms RTT → Madrid (523 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Start Campus |
|---|---|
| Published capacity | 200 MW |
| City | Sines |
| Country | Portugal |
| Address | — |
| Coordinates | 37.95000, -8.87000 |
| Year | — |
| Status | Under construction |
| Phase | Next phase of the Sines campus (1.2 GW planned in total) |
| Expected year | — |
| IT load | — |
| Capacity note | 200 MW planned facility per Start Campus official site; not in service. Campus has 1.2 GW of secured IT grid capacity (REN, Aug 2024). Checked 21 Oct 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 21/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.