Blackstone / QTS - Proyecto Rhodes Rhodes
Verified profile of Blackstone / QTS - Proyecto Rhodes Rhodes (Blackstone / QTS – Proyecto Rhodes), a 650 MW data centre in Calatorao, Spain: mapped…
MW
650
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
650 MW
Year
Not published
Operator
Blackstone / QTS – Proyecto Rhodes
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~3.3 ms RTT → Madrid (233 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Blackstone / QTS – Proyecto Rhodes |
|---|---|
| Published capacity | 650 MW |
| City | Calatorao |
| Country | Spain |
| Address | — |
| Coordinates | 41.52224, -1.34644 |
| Year | — |
| Status | Announced |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Power not verified against a primary source. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 15/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.
