BtMData — Energía y compliance para centros de datos
    Alcalá de Henares

    CPD TITAN Alcalá de Henares

    Verified profile of CPD TITAN Alcalá de Henares (CPD TITAN), a data centre in Alcalá de Henares, Spain: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Alcalá de Henares, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    CPD TITAN

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.3 ms RTT → Madrid (30 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerCPD TITAN
    Published capacity—
    CityAlcalá de Henares
    CountrySpain
    Address—
    Coordinates40.48195, -3.36398
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for CPD TITAN Alcalá de Henares

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass