BtMData — Energía y compliance para centros de datos
    Alcobendas

    CyrusOne MAD1 Alcobendas

    Verified profile of CyrusOne MAD1 Alcobendas (CyrusOne), a 18 MW data centre in Alcobendas, Spain: mapped location, grid context and nearby renewables.

    MW

    18

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Alcobendas, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    18 MW

    Year

    Not published

    Operator

    CyrusOne

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.1 ms RTT → Madrid (15 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerCyrusOne
    Published capacity18 MW
    CityAlcobendas
    CountrySpain
    Address—
    Coordinates40.54001, -3.63585
    Year—
    StatusOperational
    PhaseCommissioning year not confirmed by an official source. The 2023-11-08 topping-out ceremony was not an opening: https://www.cyrusone.com/resources/press-releases/cyrusone-and-partners-celebrate-topping-out-at-mad1-data-centre-with-traditional-flag-flying-ceremony .
    Expected year—
    IT load18 MW
    Capacity noteCyrusOne states 18 MW IT capacity for MAD1; separate 34 MVA power supply, not 34 MW IT. Published facility design capacity does not prove all capacity is energized or occupied. Facility page has no visible publication date; reviewed 2026-10-25.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for CyrusOne MAD1 Alcobendas

    Assess an asset with GridPass