Digital Realty MAD3
Verified profile of Digital Realty MAD3 (Digital Realty), a 6 MW data centre in Madrid, Spain since 2019: mapped location, grid context and nearby renewables.
MW
6
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
6 MW
Year
2019
Operator
Digital Realty
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Madrid (7 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Digital Realty |
|---|---|
| Published capacity | 6 MW |
| City | Madrid |
| Country | Spain |
| Address | Calle de Emilio Muñoz 49 |
| Coordinates | 40.43220, -3.62734 |
| Year | 2019 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | 6 MW |
| Capacity note | ~6 MW IT power (initial design 5 MW IT); 11 MW is electrical supply, not IT. Press source (DCD, 23 Feb 2022, quoting Interxion), not an operator release. Opened October 2019. Checked 19 Oct 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 15/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.
