Edged Bilbao
Verified profile of Edged Bilbao (Edged (Merlin / Invenergy)), a data centre in Bilbao, Spain: mapped location, grid context and nearby renewables.
MW
β
Substations <25 km
β
Renewables <25 km
β
Renewable MW nearby
β
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
Not published
Operator
Edged (Merlin / Invenergy)
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~4.2 ms RTT β Madrid (323 km)
Computed: geodesic distance / 200 kmΒ·msβ»ΒΉ
Current ambient temperature
β¦
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loadingβ¦
Data centre record
| Operator / developer | Edged (Merlin / Invenergy) |
|---|---|
| Published capacity | β |
| City | Bilbao |
| Country | Spain |
| Address | β |
| Coordinates | 43.26000, -2.93000 |
| Year | β |
| Status | Announced |
| Phase | Site announced within the four-campus Spanish plan |
| Expected year | β |
| IT load | β |
| Capacity note | β |
| PUE | β |
| Energy type | β |
| Renewable energy | β |
| Energy note | β |
| Certifications | β |
| Certification note | β |
| Record last reviewed | 11/09/2026 |
We only publish verifiable data. Anything the operator does not publish shows as βββ; it is never estimated.
