BtMData β€” EnergΓ­a y compliance para centros de datos
    L'Hospitalet de Llobregat

    Equinix BA2

    Verified profile of Equinix BA2 (Equinix), a data centre in L'Hospitalet de Llobregat, Spain: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    L'Hospitalet de Llobregat, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Equinix

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~6 ms RTT β†’ Madrid (499 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerEquinix
    Published capacityβ€”
    CityL'Hospitalet de Llobregat
    CountrySpain
    Addressβ€”
    Coordinates41.35132, 2.09898
    Yearβ€”
    StatusOperational
    PhaseOfficial 2023-02-16 release announced construction, not opening: https://newsroom.equinix.com/2023-02-16-Equinix-to-Build-New-Data-Center-in-Barcelona-A-Growing-Connectivity-Hub-of-the-Mediterranean . That date is not treated as commissioning.
    Expected yearβ€”
    IT loadβ€”
    Capacity noteCapacity and commissioning year not confirmed in reviewed official sources. Previous 3 MW removed from headline capacity: Equinix facility page publishes floor area and redundancy, not MW. Page has no visible publication date; reviewed 2026-10-25.
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Equinix BA2

    Assess an asset with GridPass