Equinix MD6
Verified profile of Equinix MD6 (Equinix), a 4.8 MW data centre in Alcobendas, Spain since 2022: mapped location, grid context and nearby renewables.
MW
4.8
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
4.8 MW
Year
2022
Operator
Equinix
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Madrid (14 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Equinix |
|---|---|
| Published capacity | 4.8 MW |
| City | Alcobendas |
| Country | Spain |
| Address | Calle de La Pedriza 12, 28108 |
| Coordinates | 40.53454, -3.66196 |
| Year | 2022 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Opened September 2022 with 4.8 MW and 1,500 m² of technical space; planned to exceed 30 MW when fully built out. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 25/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.