    Bilbao

    Five Infinitum Bilbao FI_BBO_01

    Verified profile of Five Infinitum Bilbao FI_BBO_01 (Five Infinitum), a 60 MW data centre in Bilbao, Spain: mapped location, grid context and nearby…

    MW

    60

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Bilbao, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    60 MW

    Year

    Not published

    Operator

    Five Infinitum

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~4.2 ms RTT → Madrid (323 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerFive Infinitum
    Published capacity60 MW
    CityBilbao
    CountrySpain
    Address—
    Coordinates43.26300, -2.93500
    Year—
    StatusAnnounced
    PhaseThe developer locates FI_BBO_01 at Campus Abanto, Euskadi Technology Park, not Bilbao municipality; current coordinates have not been revalidated. Construction targeted for Q4 2026 and operation for Q3 2028 in the July 2025 announcement, not confirmed dates.
    Expected year2028
    IT load—
    Capacity noteInitial 30 MW, scalable to 60 MW planned, according to Five Infinitum (July 2025); IT/utility basis is not explicit. The 60 MW figure is not operating capacity. Secured land and power are developer statements, not independent grid-operator validation. Reviewed 25 October 2026.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.