BtMData — Energía y compliance para centros de datos
    Madrid

    Goodman Group MAD01

    Verified profile of Goodman Group MAD01 (Goodman Group), a 11.7 MW data centre in Madrid, Spain: mapped location, grid context and nearby renewables.

    MW

    11.7

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Madrid, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    11.7 MW

    Year

    Not published

    Operator

    Goodman Group

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1 ms RTT → Madrid (0 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGoodman Group
    Published capacity11.7 MW
    CityMadrid
    CountrySpain
    Address—
    Coordinates40.41678, -3.70351
    Year—
    StatusUnder construction
    Phase—
    Expected year—
    IT load—
    Capacity notePower not verified against a primary source.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Goodman Group MAD01

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass