BtMData — Energía y compliance para centros de datos
    Talavera de la Reina

    Grupo Aire Talavera de la Reina

    Verified profile of Grupo Aire Talavera de la Reina (Grupo Aire), a data centre in Talavera de la Reina, Spain: mapped location, grid context and nearby…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Talavera de la Reina, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Grupo Aire

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~2.1 ms RTT → Madrid (110 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGrupo Aire
    Published capacity—
    CityTalavera de la Reina
    CountrySpain
    Address—
    Coordinates39.95694, -4.84405
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Grupo Aire Talavera de la Reina

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass