Kumo Networks (El Corte Inglés) Paterna
Verified profile of Kumo Networks (El Corte Inglés) Paterna (Kumo Networks (El Corte Inglés)), a 2.4 MW data centre in Paterna, Spain: mapped location, grid…
MW
2.4
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
2.4 MW
Year
Not published
Operator
Kumo Networks (El Corte Inglés)
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~3.9 ms RTT → Madrid (294 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Kumo Networks (El Corte Inglés) |
|---|---|
| Published capacity | 2.4 MW |
| City | Paterna |
| Country | Spain |
| Address | — |
| Coordinates | 39.51905, -0.45713 |
| Year | — |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Power not verified against a primary source. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | — |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.