    MERLIN Edged Barcelona

    Verified profile of MERLIN Edged Barcelona (Merlin Edged), a 22 MW data centre in Barcelona, Spain since 2025: mapped location, grid context and nearby…

    MW

    22

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Barcelona, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    22 MW

    Year

    2025

    Operator

    Merlin Edged

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~6.1 ms RTT → Madrid (506 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerMerlin Edged
    Published capacity22 MW
    CityBarcelona
    CountrySpain
    Address—
    Coordinates41.38258, 2.17707
    Year2025
    StatusOperational
    PhaseInaugurated on 13 May 2025, according to the MERLIN announcement published that day.
    Expected year—
    IT load—
    Capacity note22 MW facility design capacity published by Edged (30 May 2025), not measured operating power. The 15 MW CoreWeave lease is part of the facility, not additional capacity. The 22 MW figure is not assigned as operating IT load. Reviewed 25 October 2026.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.