    Merlin Edged Bilbao-Arasur Campus

    Verified profile of Merlin Edged Bilbao-Arasur Campus (Merlin Edged), a data centre in Rivabellosa, Spain: mapped location, grid context and nearby…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Rivabellosa, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Merlin Edged

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.6 ms RTT → Madrid (263 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerMerlin Edged
    Published capacity—
    CityRivabellosa
    CountrySpain
    Address—
    Coordinates42.71227, -2.91807
    Year—
    StatusUnder construction
    PhaseCampus-scope record, not an individual building. First building inaugurated on 3 December 2024; second described as under construction on 17 September 2025. This does not mean the whole campus is operational.
    Expected year—
    IT load—
    Capacity note48 MW removed from this generic marker: they refer to the second building BIL02, where they remain as planned capacity. Do not duplicate that figure. MERLIN publishes 118 MW for the campus in its 17 September 2025 update; this is not measured operating power or additional capacity beyond its buildings. Reviewed 25 October 2026.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Merlin Edged Bilbao-Arasur Campus

    Assess an asset with GridPass