N2
Verified profile of N2 (Nabiax), a data centre in Simancas, Spain: mapped location, grid context and nearby renewables.
MW
—
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
Not published
Operator
Nabiax
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Madrid (7 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Nabiax |
|---|---|
| Published capacity | — |
| City | Simancas |
| Country | Spain |
| Address | — |
| Coordinates | 40.43347, -3.62947 |
| Year | — |
| Status | Operational |
| Phase | Source gives inaugurations across 1995–2011 for the complex; this module individual year is not confirmed. No single year inferred from the range. |
| Expected year | — |
| IT load | — |
| Capacity note | Nabiax states 10 MW current IT capacity across three Julián Camarillo modules, expandable to 15 MW; no N1/N2/N3 split published. Individual capacity not confirmed: 10 MW is not assigned to each record. Page has no visible publication date; reviewed 2026-10-25. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 25/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.