BtMData — Energía y compliance para centros de datos
    Zaragoza

    Tillion Data Centers ZAZ1

    Verified profile of Tillion Data Centers ZAZ1 (Tillion Data Centers), a 150 MW data centre in Zaragoza, Spain: mapped location, grid context and nearby…

    MW

    150

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Zaragoza, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    150 MW

    Year

    Not published

    Operator

    Tillion Data Centers

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.8 ms RTT → Madrid (283 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerTillion Data Centers
    Published capacity150 MW
    CityZaragoza
    CountrySpain
    Address—
    Coordinates41.68575, -0.77403
    Year—
    StatusAnnounced
    PhaseAnnounced project. Azora (2025-03-13) targeted construction start in 2026; this does not confirm actual construction or commissioning. Opening year and operating capacity unconfirmed. Reviewed 2026-10-25.
    Expected year—
    IT load—
    Capacity noteReviewed 2026-10-25. Tillion publishes 150 MW of secured grid capacity, scalable to 300 MW. Azora (2025-03-13) describes an initial 150 MW grid concession and planned expansion to 300 MW: https://www.azora.com/en/blog/azora-to-invest-e2-billion-in-zaragoza-data-centre/ . Grid connection and planned development, not IT load or measured operating capacity; 300 MW is not current capacity.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.