BtMData — Energía y compliance para centros de datos
    Torrelobatón

    Vapat Torrelobatón Data Center

    Verified profile of Vapat Torrelobatón Data Center (Vapat), a data centre in Torrelobatón, Spain: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Torrelobatón, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Vapat

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~2.8 ms RTT → Madrid (176 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerVapat
    Published capacity—
    CityTorrelobatón
    CountrySpain
    Address—
    Coordinates41.64904, -5.02508
    Year—
    StatusAnnounced
    PhaseProject announced according to industry press. Administrative status, construction start and opening date are unconfirmed against a primary source.
    Expected year—
    IT load—
    Capacity notePrevious 160 MW figure removed: industry press describes maximum planned capacity, but no accessible primary source was found confirming the figure, scope and IT/utility basis. Vapat remains a provisional attribution from the secondary source, not a verified operator. Reviewed 25 October 2026.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Vapat Torrelobatón Data Center

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass