BtMData β€” EnergΓ­a y compliance para centros de datos
    Falun

    EcoDataCenter Falun expansion

    Verified profile of EcoDataCenter Falun expansion (EcoDataCenter), a data centre in Falun, Sweden: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Falun, Sweden
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    EcoDataCenter

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~12.3 ms RTT β†’ Amsterdam (1126 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerEcoDataCenter
    Published capacityβ€”
    CityFalun
    CountrySweden
    Addressβ€”
    Coordinates60.61000, 15.63000
    Yearβ€”
    StatusAnnounced
    PhaseAnnounced expansion of the Falun campus
    Expected yearβ€”
    IT loadβ€”
    Capacity noteFalun campus expansion: 65 MW total planned once buildings E and F enter service (FY2024 annual report). No separate power figure to avoid double-counting the campus total.
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed22/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for EcoDataCenter Falun expansion

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass