BtMData — Energía y compliance para centros de datos
    Europe map

    Data centres in Switzerland

    Map and list of the 29 data centres in Switzerland: operator, capacity in MW, year and a linked source on every page.

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Assess my asset

    Sites

    29

    Cities

    0

    Substations ≥220 kV

    0

    Renewables ≥20 MW

    0

    Power and grid

    Clean electricity

    97.7%

    Renewables

    67.83%

    Carbon intensity

    39.22 gCO₂/kWh

    Annual demand

    65.08 TWh

    Sources: Ember – Yearly Electricity Data (2025)

    Grid congestion and connection pipeline in Switzerland

    Grid availability decides where data centres get built: lower congestion and shorter queues attract more capacity.

    Grid congestion

    0.6%

    European average 1.5%

    Growth 2024-2030

    1.7x

    European average 1.8x

    Congestion measured as redispatch and countertrading volumes as a share of demand (2021-2023).

    Data centres in Switzerland

    The BtMData map records 29 data centres in Switzerland (29 operational). 1 have published capacity, totalling 4 MW; the rest are pending a verifiable source. Main operators: Digital Realty, Equinix, Equinix, Inc., Green Datacenter AG, Colobâle AG.

    Sites

    NameOperatorCityMWYearSource

    Data verified by BtMData. Unpublished values appear as “—”.

    Frequently asked questions

    How many data centres are there in Switzerland?

    Our map lists 29 data centres in Switzerland across 0 cities. Profiles include recorded data and sources; pending fields do not constitute verified information.

    How much renewable capacity is registered in Switzerland?

    We track 0 geolocated renewable plants in Switzerland, plus 0 substations of 220 kV or above.