Green Metro-Campus Zürich Datacenter M
Verified profile of Green Metro-Campus Zürich Datacenter M (Green Datacenter AG), a data centre in Bülach, Switzerland since 2023: mapped location, grid…
MW
—
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
2023
Operator
Green Datacenter AG
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~3.3 ms RTT → Milan (231 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Green Datacenter AG |
|---|---|
| Published capacity | — |
| City | Bülach |
| Country | Switzerland |
| Address | — |
| Coordinates | 47.48110, 8.46237 |
| Year | 2023 |
| Status | Operational |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Building M, Dielsdorf campus: official opening 2023-01-17; first customers occupied in December 2022, a separate milestone. Original source: https://www.green.ch/fileadmin/user_upload/Medienmitteilungen/EN/Green_MM_2023_01_17_Green_launches_the_most_energy-efficient_data_center.pdf (published 2023-01-17; reviewed 2026-10-16). Building M capacity unverified; no whole-campus MW allocated. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.
