CyrusOne LON6 (Iver Heath)
Verified profile of CyrusOne LON6 (Iver Heath) (CyrusOne Data Centers), a 108 MW data centre in Iver Heath, United Kingdom: mapped location, grid context…
MW
108
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
108 MW
Year
Not published
Operator
CyrusOne Data Centers
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.3 ms RTT → London (27 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | CyrusOne Data Centers |
|---|---|
| Published capacity | 108 MW |
| City | Iver Heath |
| Country | United Kingdom |
| Address | Dromenagh Farm, Seven Hills Rd, SL0 0PA |
| Coordinates | 51.55172, -0.51857 |
| Year | — |
| Status | Announced |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Development project: CyrusOne plans 108 MW of IT capacity; not in service (accessed 22 Oct 2026). |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 22/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.
