BtMData — Energía y compliance para centros de datos
    London

    Global Switch London East

    Verified profile of Global Switch London East (Global Switch), a 87 MW data centre in London, United Kingdom since 2002: mapped location, grid context and…

    MW

    87

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    London, United Kingdom
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    87 MW

    Year

    2002

    Operator

    Global Switch

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.1 ms RTT → London (9 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGlobal Switch
    Published capacity87 MW
    CityLondon
    CountryUnited Kingdom
    AddressNutmeg Lane 3, E14 2AX
    Coordinates51.51094, -0.00343
    Year2002
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity noteCapacity: Global Switch page lists London East at 87 MW; type not stated (page date not published; checked 2026-10-16). Year: UK government page updated 2026-03-17 states launched in 2002 (https://www.gov.uk/government/publications/industrial-energy-transformation-fund-ietf-competition-winners/ietf-phase-1-spring-2021-competition-winners). Original source: https://www.globalswitch.com/data-centres/. Checked: 2026-10-16.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed16/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Global Switch London East

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass