BtMData β€” EnergΓ­a y compliance para centros de datos
    Leeds

    Microsoft

    Verified profile of Microsoft (Microsoft), a data centre in Leeds, United Kingdom: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Leeds, United Kingdom
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Microsoft

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.7 ms RTT β†’ London (269 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerMicrosoft
    Published capacityβ€”
    CityLeeds
    CountryUnited Kingdom
    AddressWest Rd & Central Parade, LS10 1RR
    Coordinates53.77581, -1.49569
    Yearβ€”
    StatusOperational
    Phaseβ€”
    Expected yearβ€”
    IT loadβ€”
    Capacity noteβ€”
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed14/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Microsoft

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass